Commonwealth of Australia Bills

[Index] [Search] [Download] [Related Items] [Help]


This is a Bill, not an Act. For current law, see the Acts databases.


TELECOMMUNICATIONS LEGISLATION AMENDMENT BILL 2018

 

 

 

2016-2017-2018 

 

The Parliament of the 

Commonwealth of Australia 

 

THE SENATE 

 

 

 

 

Presented and read a first time 

 

 

 

 

Telecommunications Legislation 

Amendment Bill 2018 

 

No.      , 2018 

 

(Communications and the Arts) 

 

 

 

A Bill for an Act to amend legislation relating to 

telecommunications, and for other purposes 

   

   

 

 

No.      , 2018 

Telecommunications Legislation Amendment Bill 2018 

i 

 

Contents 

Short title ........................................................................................... 1

 

Commencement ................................................................................. 1

 

Schedules ........................................................................................... 2

 

Schedule 1--Access to a telecommunications transmission 

tower owned or operated by an NBN corporation 

etc.

 

3

 

National Broadband Network Companies Act 2011

 

3

 

Schedule 2--Temporary facilities

 

15

 

Telecommunications Act 1997

 

15

 

 

 

 

No.      , 2018 

Telecommunications Legislation Amendment Bill 2018 

1 

 

A Bill for an Act to amend legislation relating to 

telecommunications, and for other purposes 

The Parliament of Australia enacts: 

1  Short title 

 

  This Act is the Telecommunications Legislation Amendment Act 

2018

2  Commencement 

 

(1)  Each provision of this Act specified in column 1 of the table 

commences, or is taken to have commenced, in accordance with 

column 2 of the table. Any other statement in column 2 has effect 

10 

according to its terms. 

11 

 

12 

   

   

 

 

2 

Telecommunications Legislation Amendment Bill 2018 

No.      , 2018 

 

Commencement information 

Column 1 

Column 2 

Column 3 

Provisions 

Commencement 

Date/Details 

1.  The whole of 

this Act 

The day after this Act receives the Royal 

Assent. 

 

Note: 

This table relates only to the provisions of this Act as originally 

enacted. It will not be amended to deal with any later amendments of 

this Act. 

 

(2)  Any information in column 3 of the table is not part of this Act. 

Information may be inserted in this column, or information in it 

may be edited, in any published version of this Act. 

3  Schedules 

 

  Legislation that is specified in a Schedule to this Act is amended or 

repealed as set out in the applicable items in the Schedule 

concerned, and any other item in a Schedule to this Act has effect 

10 

according to its terms. 

11 

Access to a telecommunications transmission tower owned or operated by an NBN 

corporation etc.  Schedule 1 

   

 

 

No.      , 2018 

Telecommunications Legislation Amendment Bill 2018 

3 

 

Schedule 1--Access to a telecommunications 

transmission tower owned or operated 

by an NBN corporation etc. 

   

National Broadband Network Companies Act 2011 

1  Section 5 

Insert: 

telecommunications transmission tower has the same meaning as 

in Part 5 of Schedule 1 to the Telecommunications Act 1997

2  After Subdivision B of Division 2 of Part 2 

10 

Insert: 

11 

Subdivision BA--Access to a telecommunications transmission 

12 

tower owned or operated by an NBN corporation etc. 

13 

19A  Access to a telecommunications transmission tower 

14 

 

(1)  If a telecommunications transmission tower (the first tower) is 

15 

owned or operated by an NBN corporation, the NBN corporation 

16 

must, if requested to do so by an eligible person, give the eligible 

17 

person access to the first tower if: 

18 

 

(a)  the access is for the sole purpose of enabling the eligible 

19 

person to: 

20 

 

(i)  install particular equipment on the first tower; or 

21 

 

(ii)  maintain, operate or remove particular equipment 

22 

installed by the eligible person on the first tower; and 

23 

 

(b)  in a case where subparagraph (a)(i) applies--the NBN 

24 

corporation is satisfied that the installation of the equipment 

25 

is technically feasible; and 

26 

 

(c)  in a case where: 

27 

 

(i)  subparagraph (a)(i) applies; and 

28 

 

(ii)  there is another telecommunications transmission tower 

29 

in the vicinity of the first tower that is not owned or 

30 

operated by the NBN corporation; 

31 

Schedule 1  Access to a telecommunications transmission tower owned or operated by 

an NBN corporation etc. 

   

 

 

4 

Telecommunications Legislation Amendment Bill 2018 

No.      , 2018 

 

 

  the NBN corporation is reasonably satisfied that it would not 

be reasonable for the eligible person to install the equipment 

on the other tower. 

Note 1: 

For eligible person, see section 19H. 

Note 2: 

For equipment, see section 19G. 

Note 3: 

See section 19C (reasonableness). 

Exemptions from sections 9, 18 and 19 

 

(2)  If the NBN corporation gives the eligible person access to the first 

tower in compliance with subsection (1), sections 9, 18 and 19 do 

not apply to: 

10 

 

(a)  the giving of access; or 

11 

 

(b)  the supply to the eligible person of goods that are incidental 

12 

to the giving of access. 

13 

Limits on subsection (1) obligation 

14 

 

(3)  Subsection (1) does not impose an obligation to the extent (if any) 

15 

to which the imposition of the obligation would have any of the 

16 

following effects: 

17 

 

(a)  preventing an NBN corporation from reserving sufficient 

18 

space on the first tower to be able to meet the NBN 

19 

corporation's reasonably anticipated requirements in relation 

20 

to the installation of equipment, measured at the time when 

21 

the request was made; 

22 

 

(b)  preventing a person (other than an NBN corporation) who 

23 

has already installed equipment on the first tower from 

24 

obtaining access to sufficient space on the first tower to be 

25 

able to meet the person's reasonably anticipated requirements 

26 

in relation to the installation of equipment, measured at the 

27 

time when the request was made; 

28 

 

(c)  depriving any person of a protected contractual right. 

29 

 

(4)  For the purposes of paragraph (3)(c), protected contractual right 

30 

means a right under a contract that was in force at the 

31 

commencement of this section. 

32 

 

(5)  Subsection (1) does not impose an obligation to give an eligible 

33 

person access to the first tower if: 

34 

Access to a telecommunications transmission tower owned or operated by an NBN 

corporation etc.  Schedule 1 

   

 

 

No.      , 2018 

Telecommunications Legislation Amendment Bill 2018 

5 

 

 

(a)  the eligible person is included in a class of persons specified 

under paragraph 19H(2)(a); and 

 

(b)  the imposition of the obligation would be inconsistent with a 

limitation or restriction that, under paragraph 19H(2)(b), is 

applicable to that class. 

Exemption from compliance with subsection (1)--Ministerial 

determination 

 

(6)  The Minister may, by legislative instrument, determine that 

subsection (1) does not impose an obligation if the conditions 

specified in the determination are satisfied. 

10 

Technically feasible 

11 

 

(7)  For the purposes of this section, in determining whether it is 

12 

technically feasible to install particular equipment on a 

13 

telecommunications transmission tower, an NBN corporation must 

14 

have regard to: 

15 

 

(a)  whether the installation of the equipment is likely to result in 

16 

significant difficulties of a technical or engineering nature; 

17 

and 

18 

 

(b)  whether the installation of the equipment is likely to result in 

19 

a significant threat to the health or safety of persons who 

20 

operate, or work on, the tower; and 

21 

 

(c)  if the installation of the equipment is likely to have a result 

22 

referred to in paragraph (a) or (b)--whether there are 

23 

practicable means of avoiding such a result, including (but 

24 

not limited to): 

25 

 

(i)  changing the configuration or operating parameters of a 

26 

facility situated on the tower; and 

27 

 

(ii)  making alterations to the tower; and 

28 

 

(d)  such other matters (if any) as are relevant. 

29 

 

(8)  For the purposes of subsection (7), facility has the same meaning 

30 

as in the Telecommunications Act 1997

31 

19B  Access to the site of a telecommunications transmission tower 

32 

 

(1)  If: 

33 

Schedule 1  Access to a telecommunications transmission tower owned or operated by 

an NBN corporation etc. 

   

 

 

6 

Telecommunications Legislation Amendment Bill 2018 

No.      , 2018 

 

 

(a)  a telecommunications transmission tower owned or operated 

by an NBN corporation is situated on a particular site, and: 

 

(i)  the site is owned, occupied or controlled by the NBN 

corporation; or 

 

(ii)  the NBN corporation has a right (whether conditional or 

unconditional) to use the site; and 

 

(b)  the NBN corporation is or was required by subsection 19A(1) 

to give an eligible person access to the tower for the purpose 

of enabling the eligible person to: 

 

(i)  install particular equipment on the tower; or 

10 

 

(ii)  maintain, operate or remove particular equipment 

11 

installed by the eligible person on the tower; 

12 

the NBN corporation must, if requested to do so by the eligible 

13 

person: 

14 

 

(c)  give the eligible person access to the site for the sole purpose 

15 

of enabling the eligible person to: 

16 

 

(i)  install the equipment on the tower; or 

17 

 

(ii)  maintain, operate or remove the equipment installed by 

18 

the eligible person on the tower; and 

19 

 

(d)  give the eligible person access to the site for the sole purpose 

20 

of enabling the eligible person to: 

21 

 

(i)  install particular equipment on the site, where that 

22 

equipment is for use in connection with the equipment 

23 

mentioned in paragraph (b); or 

24 

 

(ii)  maintain, operate or remove the equipment first 

25 

mentioned in subparagraph (i). 

26 

Note 1: 

For eligible person, see section 19H. 

27 

Note 2: 

For site, see section 19J. 

28 

Note 3: 

For equipment, see section 19G. 

29 

Exemptions from sections 9, 18 and 19 

30 

 

(2)  If the NBN corporation gives the eligible person access to the site 

31 

in compliance with subsection (1), sections 9, 18 and 19 do not 

32 

apply to: 

33 

 

(a)  the giving of access; or 

34 

 

(b)  the supply to the eligible person of goods that are incidental 

35 

to the giving of access. 

36 

Access to a telecommunications transmission tower owned or operated by an NBN 

corporation etc.  Schedule 1 

   

 

 

No.      , 2018 

Telecommunications Legislation Amendment Bill 2018 

7 

 

Exemption from compliance with subsection (1)--Ministerial 

determination 

 

(3)  The Minister may, by legislative instrument, determine that 

subsection (1) does not impose an obligation if the conditions 

specified in the determination are satisfied. 

19C  Reasonableness--Ministerial determinations 

 

(1)  The Minister may, by legislative instrument: 

 

(a)  determine that, if a condition specified in the determination is 

satisfied then, for the purposes of paragraph 19A(1)(c), it is 

taken to be reasonable for an eligible person to install 

10 

equipment on a telecommunications transmission tower; or 

11 

 

(b)  determine that, if a condition specified in the determination is 

12 

satisfied then, for the purposes of paragraph 19A(1)(c), it is 

13 

taken not to be reasonable for an eligible person to install 

14 

equipment on a telecommunications transmission tower. 

15 

Note: 

For eligible person, see section 19H. 

16 

 

(2)  A determination under subsection (1) must be an instrument of a 

17 

legislative character. 

18 

19D  Publication of access terms and conditions--towers 

19 

 

(1)  If a telecommunications transmission tower is owned or operated 

20 

by an NBN corporation, the NBN corporation must publish on its 

21 

website: 

22 

 

(a)  the terms and conditions relating to price or a method of 

23 

ascertaining price; and 

24 

 

(b)  other terms and conditions; 

25 

on which the NBN corporation offers to: 

26 

 

(c)  give an eligible person access to the tower, in compliance 

27 

with subsection 19A(1), for the purpose of enabling the 

28 

eligible person to: 

29 

 

(i)  install particular equipment; or 

30 

 

(ii)  maintain, operate or remove particular equipment; and 

31 

 

(d)  supply to an eligible person goods that are incidental to the 

32 

giving of that access. 

33 

Note: 

For eligible person, see section 19H. 

34 

Schedule 1  Access to a telecommunications transmission tower owned or operated by 

an NBN corporation etc. 

   

 

 

8 

Telecommunications Legislation Amendment Bill 2018 

No.      , 2018 

 

 

(2)  If: 

 

(a)  a telecommunications transmission tower is owned or 

operated by an NBN corporation; and 

 

(b)  an eligible person requests the NBN corporation to: 

 

(i)  give the eligible person access to the tower; or 

 

(ii)  supply to the eligible person goods that are incidental to 

giving the eligible person access to the tower; and 

 

(c)  as a result of the request, the NBN corporation has an 

obligation under subsection 19A(1) to give access to the 

tower or supply the goods, as the case requires; and 

10 

 

(d)  in accordance with subsection (1), the NBN corporation has 

11 

published on its website: 

12 

 

(i)  the terms and conditions relating to price or a method of 

13 

ascertaining price; and 

14 

 

(ii)  other terms and conditions; 

15 

 

  on which the NBN corporation offers to give access to the 

16 

tower or supply the goods, as the case requires; and 

17 

 

(e)  the eligible person requests the NBN corporation to enter into 

18 

an agreement that: 

19 

 

(i)  relates to the access to the tower or the supply of the 

20 

goods, as the case requires; and 

21 

 

(ii)  sets out terms and conditions that are the same as the 

22 

terms and conditions published as mentioned in 

23 

paragraph (d); 

24 

the NBN corporation must comply with the request mentioned in 

25 

paragraph (e). 

26 

 

(3)  If: 

27 

 

(a)  a telecommunications transmission tower is owned or 

28 

operated by an NBN corporation; and 

29 

 

(b)  an eligible person requests the NBN corporation to: 

30 

 

(i)  give the eligible person access to the tower; or 

31 

 

(ii)  supply to the eligible person goods that are incidental to 

32 

giving the eligible person access to the tower; and 

33 

 

(c)  as a result of the request, the NBN corporation has an 

34 

obligation under subsection 19A(1) to give access to the 

35 

tower or supply the goods, as the case requires; and 

36 

Access to a telecommunications transmission tower owned or operated by an NBN 

corporation etc.  Schedule 1 

   

 

 

No.      , 2018 

Telecommunications Legislation Amendment Bill 2018 

9 

 

 

(d)  the access to the tower, or the supply of the goods, is not 

covered by an agreement between the NBN corporation and 

the eligible person; 

the terms and conditions on which the access is given, or the goods 

are supplied, as the case may be, are the terms and conditions that 

were published on the NBN corporation's website, in accordance 

with subsection (1), at the time when the request was made. 

19E  Publication of access terms and conditions--sites 

 

(1)  If: 

 

(a)  a telecommunications transmission tower owned or operated 

10 

by an NBN corporation is situated on a particular site; and 

11 

 

(b)  either: 

12 

 

(i)  the site is owned, occupied or controlled by the NBN 

13 

corporation; or 

14 

 

(ii)  the NBN corporation has a right (whether conditional or 

15 

unconditional) to use the site; 

16 

the NBN corporation must cause to be published on its website: 

17 

 

(c)  the terms and conditions relating to price or a method of 

18 

ascertaining price; and 

19 

 

(d)  other terms and conditions; 

20 

on which it offers to: 

21 

 

(e)  give an eligible person access to the site, in compliance with 

22 

subsection 19B(1), for the purpose of enabling the eligible 

23 

person to: 

24 

 

(i)  install particular equipment; or 

25 

 

(ii)  maintain, operate or remove particular equipment; and 

26 

 

(f)  supply to an eligible person goods that are incidental to the 

27 

giving of that access. 

28 

Note 1: 

For site, see section 19J. 

29 

Note 2: 

For eligible person, see section 19H. 

30 

 

(2)  If: 

31 

 

(a)  a telecommunications transmission tower owned or operated 

32 

by an NBN corporation is situated on a particular site; and 

33 

 

(b)  either: 

34 

 

(i)  the site is owned, occupied or controlled by the NBN 

35 

corporation; or 

36 

Schedule 1  Access to a telecommunications transmission tower owned or operated by 

an NBN corporation etc. 

   

 

 

10 

Telecommunications Legislation Amendment Bill 2018 

No.      , 2018 

 

 

(ii)  the NBN corporation has a right (whether conditional or 

unconditional) to use the site; and 

 

(c)  an eligible person requests the NBN corporation to: 

 

(i)  give the eligible person access to the site; or 

 

(ii)  supply to the eligible person goods that are incidental to 

giving the eligible person access to the site; and 

 

(d)  as a result of the request, the NBN corporation has an 

obligation under subsection 19B(1) to give access to the site 

or supply the goods, as the case requires; and 

 

(e)  in accordance with subsection (1), the NBN corporation has 

10 

published on its website: 

11 

 

(i)  the terms and conditions relating to price or a method of 

12 

ascertaining price; and 

13 

 

(ii)  other terms and conditions; 

14 

 

  on which the NBN corporation offers to give access to the 

15 

site or supply the goods, as the case requires; and 

16 

 

(f)  the eligible person requests the NBN corporation to enter into 

17 

an agreement that: 

18 

 

(i)  relates to the access to the site or the supply of the 

19 

goods, as the case requires; and 

20 

 

(ii)  sets out terms and conditions that are the same as the 

21 

terms and conditions published as mentioned in 

22 

paragraph (e); 

23 

the NBN corporation must comply with the request mentioned in 

24 

paragraph (f). 

25 

 

(3)  If: 

26 

 

(a)  a telecommunications transmission tower owned or operated 

27 

by an NBN corporation is situated on a particular site; and 

28 

 

(b)  either: 

29 

 

(i)  the site is owned, occupied or controlled by the NBN 

30 

corporation; or 

31 

 

(ii)  the NBN corporation has a right (whether conditional or 

32 

unconditional) to use the site; and 

33 

 

(c)  an eligible person requests the NBN corporation to: 

34 

 

(i)  give the eligible person access to the site; or 

35 

 

(ii)  supply to the eligible person goods that are incidental to 

36 

giving the eligible person access to the site; and 

37 

Access to a telecommunications transmission tower owned or operated by an NBN 

corporation etc.  Schedule 1 

   

 

 

No.      , 2018 

Telecommunications Legislation Amendment Bill 2018 

11 

 

 

(d)  as a result of the request, the NBN corporation has an 

obligation under subsection 19B(1) to give access to the site 

or supply the goods, as the case requires; and 

 

(e)  the access to the site, or the supply of the goods, is not 

covered by an agreement between the NBN corporation and 

the eligible person; 

the terms and conditions on which the access is given, or the goods 

are supplied, as the case may be, are the terms and conditions that 

were published on the NBN corporation's website, in accordance 

with subsection (1), at the time when the request was made. 

10 

19F  Terms and conditions of access to be on a non-discriminatory 

11 

basis 

12 

Telecommunications transmission towers 

13 

 

(1)  If a telecommunications transmission tower is owned or operated 

14 

by an NBN corporation, the NBN corporation must not, in 

15 

determining: 

16 

 

(a)  the terms and conditions relating to price or a method of 

17 

ascertaining price; and 

18 

 

(b)  other terms and conditions; 

19 

on which the NBN corporation: 

20 

 

(c)  gives an eligible person access to the tower, in compliance 

21 

with subsection 19A(1), for the purpose of enabling the 

22 

eligible person to: 

23 

 

(i)  install particular equipment; or 

24 

 

(ii)  maintain, operate or remove particular equipment; and 

25 

 

(d)  supplies to an eligible person goods that are incidental to the 

26 

giving of that access; 

27 

discriminate between eligible persons who seek or obtain access in 

28 

such circumstances. 

29 

Note: 

For eligible person, see section 19H. 

30 

Sites 

31 

 

(2)  If: 

32 

 

(a)  a telecommunications transmission tower owned or operated 

33 

by an NBN corporation is situated on a particular site; and 

34 

 

(b)  either: 

35 

Schedule 1  Access to a telecommunications transmission tower owned or operated by 

an NBN corporation etc. 

   

 

 

12 

Telecommunications Legislation Amendment Bill 2018 

No.      , 2018 

 

 

(i)  the site is owned, occupied or controlled by the NBN 

corporation; or 

 

(ii)  the NBN corporation has a right (whether conditional or 

unconditional) to use the site; 

the NBN corporation must not, in determining: 

 

(c)  the terms and conditions relating to price or a method of 

ascertaining price; and 

 

(d)  other terms and conditions; 

on which the NBN corporation: 

 

(e)  gives an eligible person access to the site, in compliance with 

10 

subsection 19B(1), for the purpose of enabling the eligible 

11 

person to: 

12 

 

(i)  install particular equipment; or 

13 

 

(ii)  maintain, operate or remove particular equipment; and 

14 

 

(f)  supplies to an eligible person goods that are incidental to the 

15 

giving of that access; 

16 

discriminate between eligible persons who seek or obtain access in 

17 

such circumstances. 

18 

19G  Equipment 

19 

 

(1)  For the purposes of this Subdivision, equipment means: 

20 

 

(a)  a facility (within the meaning of the Telecommunications Act 

21 

1997); or 

22 

 

(b)  an antenna; or 

23 

 

(c)  a measuring device; or 

24 

 

(d)  an apparatus; or 

25 

 

(e)  a thing that belongs to a class of things specified under 

26 

subsection (2). 

27 

 

(2)  The Minister may, by legislative instrument, specify one or more 

28 

classes of things for the purposes of paragraph (1)(e). 

29 

19H  Eligible person 

30 

 

(1)  For the purposes of this Subdivision, eligible person means: 

31 

 

(a)  a police force or service; or 

32 

 

(b)  a fire service; or 

33 

 

(c)  an ambulance service; or 

34 

Access to a telecommunications transmission tower owned or operated by an NBN 

corporation etc.  Schedule 1 

   

 

 

No.      , 2018 

Telecommunications Legislation Amendment Bill 2018 

13 

 

 

(d)  a State or Territory emergency services organisation; or 

 

(e)  a person who is included in a class of persons specified under 

paragraph (2)(a). 

 

(2)  The Minister may, by legislative instrument, do any or all of the 

following: 

 

(a)  specify one or more classes of persons for the purposes of 

paragraph (1)(e); 

 

(b)  for a class specified under paragraph (a)--declare that one or 

more specified limitations or restrictions are applicable to 

that class for the purposes of subsection 19A(5). 

10 

 

(3)  The Minister must not make a legislative instrument under 

11 

subsection (2) unless the Minister is satisfied that it is in the public 

12 

interest to do so. 

13 

 

(4)  Before making a legislative instrument under subsection (2), the 

14 

Minister must consult the Minister who administers the Australian 

15 

Federal Police Act 1979

16 

19J  Site 

17 

 

  For the purposes of this Subdivision, site means: 

18 

 

(a)  land; or 

19 

 

(b)  a building on land; or 

20 

 

(c)  a structure on land. 

21 

19K  Goods 

22 

 

  For the purposes of this Subdivision, goods includes electricity. 

23 

3  Section 37 

24 

After "19,", insert "19A, 19B, 19D, 19E, 19F,". 

25 

4  Subsection 38(2) 

26 

After "19,", insert "19A, 19B, 19D, 19E, 19F,". 

27 

5  Section 39 

28 

After "19,", insert "19A, 19B, 19D, 19E, 19F,". 

29 

Schedule 1  Access to a telecommunications transmission tower owned or operated by 

an NBN corporation etc. 

   

 

 

14 

Telecommunications Legislation Amendment Bill 2018 

No.      , 2018 

 

6  Section 40 

After "19,", insert "19A, 19B, 19D, 19E, 19F,". 

Temporary facilities  Schedule 2 

   

 

 

No.      , 2018 

Telecommunications Legislation Amendment Bill 2018 

15 

 

Schedule 2--Temporary facilities 

   

Telecommunications Act 1997 

1  Clause 2 of Schedule 3 

Insert: 

high-demand holiday period means: 

 

(a)  a period of a single day; or 

 

(b)  a period of 2 or more consecutive days; 

where that day, or each of those days, as the case may be, is: 

 

(c)  a public holiday, or a public school holiday, in any State or 

10 

internal Territory; or 

11 

 

(d)  a Saturday or a Sunday of a weekend immediately preceding 

12 

a Monday that is a public holiday, or public school holiday, 

13 

in any State or internal Territory; or 

14 

 

(e)  a Saturday or a Sunday of a weekend next following a Friday 

15 

that is a public holiday, or public school holiday, in any State 

16 

or internal Territory. 

17 

public land means land that: 

18 

 

(a)  is the property of: 

19 

 

(i)  the Commonwealth, a State or a Territory; or 

20 

 

(ii)  a local government body; or 

21 

 

(iii)  an authority of the Commonwealth or of a State or 

22 

Territory; and 

23 

 

(b)  is a public place. 

24 

2  Paragraphs 6(5)(a) and (b) of Schedule 3 

25 

Repeal the paragraphs, substitute: 

26 

 

(a)  both: 

27 

 

(i)  the tower is attached to a building; and 

28 

 

(ii)  the height of the tower does not exceed 5 metres; or 

29 

 

(b)  the following conditions are satisfied: 

30 

 

(i)  the tower is a temporary facility that is installed to 

31 

minimise disruption to the supply of a carriage service 

32 

that might result from the maintenance of another 

33 

facility; 

34 

Schedule 2  Temporary facilities 

   

 

 

16 

Telecommunications Legislation Amendment Bill 2018 

No.      , 2018 

 

 

(ii)  in a case where the tower is installed in a rural area 

(within the meaning of the instrument)--the height of 

the tower does not exceed 30 meters or the height of the 

other facility, whichever is the higher; 

 

(iii)  in a case where the tower is not installed in a rural area 

(within the meaning of the instrument)--the height of 

the tower does not exceed 30 metres; 

 

(iv)  in a case where it is practicable to achieve the purpose 

mentioned in subparagraph (i) by installing the tower on 

the land on which the other facility is located--the 

10 

tower is installed on that land; 

11 

 

(v)  in a case where subparagraph (iv) does not apply, but it 

12 

is practicable to achieve the purpose mentioned in 

13 

subparagraph (i) by installing the tower on public 

14 

land--the tower is installed on public land; 

15 

 

(vi)  in a case where neither subparagraph (iv) nor (v) 

16 

applies--the tower is installed in the vicinity of the 

17 

other facility; or 

18 

 

(c)  the following conditions are satisfied: 

19 

 

(i)  the tower is a temporary facility that is installed to 

20 

minimise disruption to the supply of a carriage service 

21 

that might result from carrying out the replacement of 

22 

another facility; 

23 

 

(ii)  in a case where the tower is installed in a rural area 

24 

(within the meaning of the instrument)--the height of 

25 

the tower does not exceed 30 meters or the height of the 

26 

other facility, whichever is the higher; 

27 

 

(iii)  in a case where the tower is not installed in a rural area 

28 

(within the meaning of the instrument)--the height of 

29 

the tower does not exceed 30 metres; 

30 

 

(iv)  in a case where it is practicable to achieve the purpose 

31 

mentioned in subparagraph (i) by installing the tower on 

32 

the land on which the other facility is located--the 

33 

tower is installed on that land; 

34 

 

(v)  in a case where subparagraph (iv) does not apply, but it 

35 

is practicable to achieve the purpose mentioned in 

36 

subparagraph (i) by installing the tower on public 

37 

land--the tower is installed on public land; 

38 

Temporary facilities  Schedule 2 

   

 

 

No.      , 2018 

Telecommunications Legislation Amendment Bill 2018 

17 

 

 

(vi)  in a case where neither subparagraph (iv) nor (v) 

applies--the tower is installed in the vicinity of the 

other facility; or 

 

(d)  the following conditions are satisfied: 

 

(i)  the tower is a temporary facility that is installed to 

provide additional capacity to supply carriage services 

to persons who are attending an event at a venue; 

 

(ii)  the height of the tower does not exceed 30 metres; 

 

(iii)  in a case where it is practicable to achieve the purpose 

mentioned in subparagraph (i) by installing the tower on 

10 

the land on which the venue is located--the tower is 

11 

installed on that land; 

12 

 

(iv)  in a case where subparagraph (iii) does not apply, but it 

13 

is practicable to achieve the purpose mentioned in 

14 

subparagraph (i) by installing the tower on public 

15 

land--the tower is installed on public land; 

16 

 

(v)  in a case where neither subparagraph (iii) nor (iv) 

17 

applies--the tower is installed in the vicinity of the 

18 

venue; or 

19 

 

(e)  the following conditions are satisfied: 

20 

 

(i)  the tower is a temporary facility that is installed to 

21 

provide additional capacity to supply carriage services 

22 

to persons who are attending any or all of 2 or more 

23 

events at a venue; 

24 

 

(ii)  the intervals between those events are not longer than 

25 

28 days; 

26 

 

(iii)  the height of the tower does not exceed 30 metres; 

27 

 

(iv)  in a case where it is practicable to achieve the purpose 

28 

mentioned in subparagraph (i) by installing the tower on 

29 

the land on which the venue is located--the tower is 

30 

installed on that land; 

31 

 

(v)  in a case where subparagraph (iv) does not apply, but it 

32 

is practicable to achieve the purpose mentioned in 

33 

subparagraph (i) by installing the tower on public 

34 

land--the tower is installed on public land; 

35 

 

(vi)  neither subparagraph (iv) nor (v) applies--the tower is 

36 

installed in the vicinity of the venue; or 

37 

 

(f)  the following conditions are satisfied: 

38 

Schedule 2  Temporary facilities 

   

 

 

18 

Telecommunications Legislation Amendment Bill 2018 

No.      , 2018 

 

 

(i)  the tower is a temporary facility installed to provide 

additional capacity to supply carriage services to 

persons who are physically present in a particular area 

during a high-demand holiday period; 

 

(ii)  the height of the tower does not exceed 30 metres; 

 

(iii)  the tower is installed on public land; or 

 

(g)  the tower is a temporary facility that is installed wholly or 

partly to provide capacity to supply carriage services to one 

or more emergency services organisations (within the 

meaning of the instrument) so that those organisations can 

10 

deal with an emergency or natural disaster. 

11 

3  After subclause 6(5) of Schedule 3 

12 

Insert: 

13 

 

(5A)  For the purposes of paragraph (5)(b), maintenance has the same 

14 

meaning as in clause 7. 

15 

 

(5B)  For the purposes of paragraphs (5)(d) and (e), each of the following 

16 

is an example of an event: 

17 

 

(a)  a sporting event; 

18 

 

(b)  a musical event; 

19 

 

(c)  a cultural event. 

20 

 

(5C)  For the purposes of paragraphs (5)(b), (c), (d), (e) and (f), the 

21 

height of a tower or facility is the distance between: 

22 

 

(a)  the top of the tower or facility; and 

23 

 

(b)  ground level. 

24 

4  After subclause 7(3) of Schedule 3 

25 

Insert: 

26 

 

(3A)  A reference in this clause to the maintenance of a facility (the 

27 

original facility) includes a reference to the installation of a 

28 

temporary facility (other than a tower within the meaning of 

29 

subclause 6(5)), where the following conditions are satisfied: 

30 

 

(a)  the temporary facility is installed to minimise disruption to 

31 

the supply of a carriage service that might result from the 

32 

maintenance of the original facility; 

33 

 

(b)  in a case where it is practicable to achieve the purpose 

34 

mentioned in paragraph (a) by installing the temporary 

35 

Temporary facilities  Schedule 2 

   

 

 

No.      , 2018 

Telecommunications Legislation Amendment Bill 2018 

19 

 

facility on the land on which the original facility is located--

the temporary facility is installed on that land; 

 

(c)  in a case where paragraph (b) does not apply, but it is 

practicable to achieve the purpose mentioned in paragraph (a) 

by installing the temporary facility on public land--the 

temporary facility is installed on public land; 

 

(d)  in a case where neither paragraph (b) nor (c) applies--the 

temporary facility is installed in the vicinity of the original 

facility. 

5  After clause 8 of Schedule 3 

10 

Insert: 

11 

8A  Carrier to remove temporary facilities 

12 

 

(1)  If: 

13 

 

(a)  a carrier installs a low-impact facility under Division 3; and 

14 

 

(b)  the installation is covered by paragraph 6(5)(b); 

15 

the carrier must remove the facility within 28 days after the 

16 

completion of the maintenance mentioned in that paragraph. 

17 

 

(2)  If: 

18 

 

(a)  a carrier installs a low-impact facility under Division 3; and 

19 

 

(b)  the installation is covered by paragraph 6(5)(c); 

20 

the carrier must remove the facility within 28 days after the 

21 

completion of the replacement mentioned in that paragraph. 

22 

 

(3)  If: 

23 

 

(a)  a carrier installs a low-impact facility under Division 3; and 

24 

 

(b)  the installation is covered by paragraph 6(5)(d); 

25 

the carrier must remove the facility within 28 days after the end of 

26 

the event mentioned in that paragraph. 

27 

 

(4)  If: 

28 

 

(a)  a carrier installs a low-impact facility under Division 3; and 

29 

 

(b)  the installation is covered by paragraph 6(5)(e); 

30 

the carrier must remove the facility within 28 days after the end of 

31 

the last of the events mentioned in that paragraph. 

32 

 

(5)  If: 

33 

Schedule 2  Temporary facilities 

   

 

 

20 

Telecommunications Legislation Amendment Bill 2018 

No.      , 2018 

 

 

(a)  a carrier installs a low-impact facility under Division 3; and 

 

(b)  the installation is covered by paragraph 6(5)(g); 

the carrier must remove the facility within 28 days after the facility 

ceases to be needed to provide capacity to supply carriage services 

to one or more emergency services organisations (within the 

meaning of that paragraph) so that those organisations can deal 

with an emergency or natural disaster. 

 

(6)  If: 

 

(a)  a carrier installs a facility under Division 4; and 

 

(b)  the installation is covered by subclause 7(3A); 

10 

the carrier must remove the facility within 28 days after the 

11 

completion of the maintenance mentioned in paragraph 7(3A)(a). 

12 

 

(7)  For the purposes of this clause, low-impact facility has the same 

13 

meaning as in clause 6. 

14 

8B  Low-impact facility installed at or near a venue--annual limit 

15 

 

(1)  If: 

16 

 

(a)  a carrier installs one or more low-impact facilities at a 

17 

particular place under Division 3; and 

18 

 

(b)  those installations are covered by paragraph 6(5)(d) or (e); 

19 

the carrier must ensure that the total number of days in a calendar 

20 

year on which those facilities remain at that place does not exceed 

21 

183. 

22 

 

(2)  For the purposes of this clause, low-impact facilities has the same 

23 

meaning as in clause 6. 

24 

8C  Low-impact facility installed to provide additional capacity 

25 

during a high-demand holiday period--annual limit 

26 

 

(1)  If: 

27 

 

(a)  a carrier installs one or more low-impact facilities at a 

28 

particular place under Division 3; and 

29 

 

(b)  the installation is covered by paragraph 6(5)(f); 

30 

the carrier must ensure that the total number of days in a calendar 

31 

year on which those facilities remain at that place does not exceed 

32 

90. 

33 

Temporary facilities  Schedule 2 

   

 

 

No.      , 2018 

Telecommunications Legislation Amendment Bill 2018 

21 

 

 

(2)  For the purposes of this clause, low-impact facilities has the same 

meaning as in clause 6. 

6  Clause 9 (heading) of Schedule 3 

Repeal the heading, substitute: 

9  Carrier to restore land--general 

7  After clause 9 of Schedule 3 

Insert: 

9A  Carrier to restore land--removal of temporary facilities 

 

(1)  If: 

 

(a)  a carrier installs a low-impact facility under Division 3 on 

10 

particular land; and 

11 

 

(b)  the installation of the facility is covered by paragraph 6(5)(b), 

12 

(c), (d), (e), (f) or (g); and 

13 

 

(c)  the carrier removes the facility; 

14 

the carrier must take all reasonable steps to ensure that the land is 

15 

restored to a condition that is similar to its condition before the 

16 

installation began. 

17 

 

(2)  If: 

18 

 

(a)  a carrier installs a facility under Division 4 on particular land; 

19 

and 

20 

 

(b)  the installation of the facility is covered by subclause 7(3A); 

21 

and 

22 

 

(c)  the carrier removes the facility; 

23 

the carrier must take all reasonable steps to ensure that the land is 

24 

restored to a condition that is similar to its condition before the 

25 

installation began. 

26 

 

(3)  If the installation of the facility is covered by paragraph 6(5)(b), 

27 

(c), (d), (e), (f) or (g), the carrier must take all reasonable steps to 

28 

ensure that the restoration begins within 10 business days after the 

29 

removal of the facility. 

30 

Schedule 2  Temporary facilities 

   

 

 

22 

Telecommunications Legislation Amendment Bill 2018 

No.      , 2018 

 

 

(4)  If the installation of the facility is covered by subclause 7(3A), the 

carrier must take all reasonable steps to ensure that the restoration 

begins within 10 business days after the removal of the facility. 

 

(5)  The rule in subclause (3) or (4) does not apply if the carrier agrees 

with: 

 

(a)  the owner of the land; and 

 

(b)  if the land is occupied by a person other than the owner--the 

occupier; 

to commence restoration at a time after the end of that period of 10 

business days. 

10 

 

(6)  For the purposes of this clause, low-impact facility has the same 

11 

meaning as in clause 6. 

12 

8  At the end of clause 17 of Schedule 3 

13 

Add: 

14 

 

(8)  Subclause (1) does not apply if: 

15 

 

(a)  the carrier intends to install a low-impact facility under 

16 

Division 3; and 

17 

 

(b)  the installation of the facility is covered by paragraph 6(5)(g). 

18 

 

(9)  For the purposes of this clause, low-impact facility has the same 

19 

meaning as in clause 6. 

20 

 


[Index] [Search] [Download] [Related Items] [Help]