Commonwealth Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
NAVIGATION (CONSTRUCTION) REGULATIONS 1968 - REG 99
Bilge strum boxes
- (1)
- Where the suction end of a bilge suction pipe is in a hold space or a
tunnel well, the end shall be enclosed in a strum box.
- (2)
- A strum box referred to in the last preceding subregulation:
- (a)
- shall
be provided with perforations:
- (i)
- each of which shall be approximately
three-eighths of an inch in diameter; and
- (ii)
- the combined area of which
shall be not less than twice the area of the end of the bilge suction pipe;
and
- (b)
- shall be so constructed that it can be cleared without breaking any
joint of the bilge suction pipe.
NAVIGATION (CONSTRUCTION) REGULATIONS 1968
Division 8 Sounding pipes
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback