Tasmanian Numbered Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

PLUMBING REGULATIONS 2004 (S.R. 2004, NO. 44) - REG 4

4. Certain plumbing and plumbing work exempt

      (1) In this regulation –

"exempt plumbing work" means –

(a) plumbing work that is not solely for the purposes of repairing a fire service; or

(b) plumbing work that is not the subject of a special plumbing permit.

      (2) These regulations, other than Parts 1, 2 and 7 and regulations 35, 37, 39, 41 and 47, do not apply in relation to obtaining a permit under section 75 of the Act for the carrying out of exempt plumbing work or plumbing work to repair a plumbing installation if –

(a) the work is limited to the repair or replacement of any part of a water supply system which has a nominal pipe diameter no greater than DN 20 millimetres, a sewerage system or a stormwater system; and

(b) the work –

(i) is located above ground; and

(ii) is readily visible when the repair or replacement is complete; and

(iii) does not impair any of the building’s prescribed essential safety and health features or measures; and

(iv) does not impair the health and amenity of the occupants of the building with which the work is associated; and

(v) complies with the Tasmanian Plumbing Code.

      (3) A plumber may relocate or replace an existing fixture or appliance without a plumbing permit, if –

(a) the fixture or appliance remains in the same room; and

(b) the work  –

(i) does not adversely alter the existing installation; and

(ii) does not have a water supply with a pipe size greater than DN 20 millimetres; and

(iii) does not form part of a fire service; and

(iv) does not impair the building's prescribed essential safety and health features or measures; and

(v) does not impair the health and amenity of the occupants of the building associated with the work; and

(vi) complies with the Tasmania Plumbing Code.

      (4) A plumber may clear a drain to remove a blockage without a plumbing permit if –

(a) it is carried out through openings designed for that purpose; and

(b) the relevant council is notified within 3 days after the blockage is cleared.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback