Western Australian Consolidated Acts

[Index] [Table] [Search] [Search this Act] [Notes] [Noteup] [Previous] [Download] [Help]

ABORIGINAL HERITAGE (MARANDOO) ACT 1992 - SCHEDULE 3

[s. 3(1)]

        [Heading amended by No. 19 of 2010 s. 4.]

Part 1 — Power line route

The land enclosed by a line starting at a point 2 947.42 metres at 239° 33′ 12″ from Control Station MD 15 on the north boundary of Section 3 of Miscellaneous Licence 4 issued under the Mining Act 1978 and extending

1 160.76 metres at 51° 38′ 55″
930.29 metres at 90° 00′ 00″
4 158.28 metres at 16° 46′ 42″
2 845.69 metres at 73° 40′ 02″
2 389.22 metres at 41° 05′ 44″
3 516.3 metres at 62° 55′ 29″
5 004.38 metres at 1° 56′ 50″
3 000.88 metres at 90° 00′ 00″
3 962.71 metres at 67° 07′ 27″
2 216.73 metres at 134° 01′ 12″
4 433.81 metres at 247° 26′ 53″
2 750.8 metres at 270° 00′ 00″
900.26 metres at 180° 00′ 00″
600.18 metres at 270° 00′ 00″
2 900.86 metres at 180° 00′ 00″
3 937.23 metres at 244° 24′ 41″
2 565.23 metres at 221° 31′ 20″
2 604.05 metres at 250° 14′ 33″
4 267.77 metres at 196° 03′ 21″
1 420.45 metres at 270° 00′ 00″
438.43 metres at 235° 13′ 20″

(true bearings) then back to the starting point, but excluding the land described in Part 2.

Part 2 — Rock Art Complex (PO 5757)

The land enclosed by a line starting at a point 100 metres at 0° 00′ 00″ from a point with AMG coordinates of E587 800 N7 492 900 and extending

100 metres at 90° 00′ 00″
200 metres at 180° 00′ 00″
200 metres at 270° 00′ 00″
200 metres at 0° 00′ 00″

(true bearings) then back to the starting point.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback