Western Australian Consolidated Acts[s. 3]
The line of the
railway commences at a point near Perth Coastal Grid coordinates 53081, 247630
about 29.7 kilometres along the Kewdale to Kwinana railway line, as described
in the Fourth Schedule to the
Railways (Standard Gauge) Construction Act 1961 , and proceeds in a
generally northerly direction along the median strip of the Kwinana Freeway
and then the Mitchell Freeway to a point about 400 metres north of the Narrows
Bridge, then, leaving the Mitchell Freeway, in a generally easterly direction
to a point about 100 metres east of the Mitchell Freeway, then underground in
a generally easterly direction to a southerly projection of William Street,
Perth, then generally under that street in a northerly direction to a point
near Perth Coastal Grid coordinates 53943, 263562, then underground in a
generally north-westerly direction, and terminates at a point near Perth
Coastal Grid coordinates 53293, 264015 about 0.9 kilometres along the
Perth to Joondalup railway line, as described in the Schedule to the
Perth-Joondalup Railway Act 1989 .
The course to be taken
by the railway is shown as a red line on Perth Urban Rail Development Plan
09C000004 Rev A.