Western Australian Consolidated Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

ELECTRICITY TRANSMISSION REGULATIONS 1996 - REG 49A

49A .         Contract maximum demand for existing connections

                The contract maximum demand in respect of an existing connection as at 1 April 2006 is the figure published in respect of the connection by a corporation on or before 1 May 2006.

        [Regulation 49A inserted in Gazette 31 Mar 2006 p. 1337.]



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback