Western Australian Consolidated Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Download] [Help]

MINES SAFETY AND INSPECTION REGULATIONS 1995 - SCHEDULE 3

[Regulation 6.40]

Maximum periods of inspection of registered classified plant

Column 1

Column 2

Column 3

Item No.

Description of plant

Period

1

Boilers categorized as hazard level A, B, C or D according to the criteria identified in AS 3920: Part 1

2 years

2

Pressure vessels categorized as hazard level A, B, C or D according to the criteria identified in AS 3920: Part 1, with the exception of — 

(a)         air or gas receivers with a maximum         operating pressure of 210 kPa or less;

(b)         air or gas receivers that have a capacity not         exceeding 0.15 cubic metres;

(c)         pressure vessels fitted to mobile earthmoving         equipment;

(d)         pressure vessels fitted on a train;

(e)         gas cylinders covered by AS 2030;

(f)         serially produced vessels covered by         AS 2971;

(g)         pneumatic loaders of explosives.

3 years

3

Tower cranes

Prior to use after each jump or one year whichever is less

4

Lifts

2 years

5

Hoists, with platform movement in excess of 2.4 metres and designed to lift people (Powered)

2 years

6

Boom‑type elevating work platforms

2 years

7

Gantry cranes with a safe working load greater than 5 tonnes or which are designed to handle molten metal or dangerous goods

4 years

8

Bridge cranes with a safe working load greater than 10 tonnes or which are designed to handle molten metal or dangerous goods

4 years

9

Vehicle hoists

2 years

10

Mobile cranes with a safe working load greater than 10 tonnes

2 years.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback