Western Australian Consolidated Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

TRADE MEASUREMENT REGULATIONS 2007 - REG 10

10 .         Pit of weighbridge

                If a weighbridge has a pit —

            (a)         the entrance to the pit must be covered and be at least 1 m deep and 900 mm wide; and

            (b)         the neck of the pit must be at least 900 mm wide; and

            (c)         there must be a clearance of at least 150 mm on each side of any lever in the neck of the pit; and

            (d)         there must be free access to every part of the under‑work and —

                  (i)         if free access is available from above to every part of the under‑work, there must be a clearance of at least 150 mm below all parts of the under‑work; or

                  (ii)         in any other case, there must be a clearance of at least 400 mm below the lowest lever;

                and

            (e)         the pit must be free‑draining or be provided with automatic mechanical drainage and be kept free from any accumulation of water, mud and debris.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback