Western Australian Numbered Acts

[Index] [Table] [Search] [Search this Act] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

CONSTRUCTION CONTRACTS ACT 2004 (NO. 16 OF 2004) - SECT 4

4 .         Construction work

        (1)         In this section —

        "civil works" includes —

            (a)         a road, railway, tramway, aircraft runway, canal, waterway, harbour, port or marina;

            (b)         a line or cable for electricity or telecommunications;

            (c)         a pipeline for water, gas, oil, sewage or other material;

            (d)         a path, pavement, ramp, tunnel, slipway, dam, well, aqueduct, drain, levee, seawall or retaining wall; and

            (e)         any works, apparatus, fittings, machinery or plant associated with any works referred to in paragraph (a), (b), (c) or (d);

        “site in WA” means a site in Western Australia, whether on land or off-shore.

        (2)         In this Act —

        “construction work” means any of the following work on a site in WA —

            (a)         reclaiming, draining, or preventing the subsidence, movement or erosion of, land;

            (b)         installing, altering, repairing, restoring, maintaining, extending, dismantling, demolishing, or removing, any works, apparatus, fittings, machinery, or plant, associated with any work referred to in paragraph (a);

            (c)         constructing the whole or a part of any civil works, or a building or structure, that forms or will form, whether permanently or not and whether in WA or not, part of land or the sea bed whether above or below it;

            (d)         fixing or installing on or in any thing referred to in paragraph (c) any fittings forming, or to form, whether permanently or not, part of the thing, including —

                  (i)         fittings for electricity, gas, water, fuel oil, air, sanitation, irrigation, telecommunications, air-conditioning, heating, ventilation, fire protection, cleaning, the security of the thing, and the safety of people; and

                  (ii)         lifts, escalators, insulation, furniture and furnishings;

            (e)         altering, repairing, restoring, maintaining, extending, dismantling, demolishing or removing any thing referred to in paragraph (c) or any fittings described in paragraph (d) that form part of that thing;

            (f)         any work that is preparatory to, necessary for, an integral part of, or for the completion of, any work referred to in paragraph (a), (b), (c), (d) or (e), including —

                  (i)         site or earth works, excavating, earthmoving, tunnelling or boring;

                  (ii)         laying foundations;

                  (iii)         erecting, maintaining or dismantling temporary works, a temporary building, or a temporary structure including a crane or other lifting equipment, and scaffolding;

                  (iv)         cleaning, painting, decorating or treating any surface; and

                  (v)         site restoration and landscaping;

            (g)         any work that is prescribed by regulations to be construction work for the purposes of this Act.

        (3)         Despite subsection (2) construction work does not include any of the following work on a site in WA —

            (a)         drilling for the purposes of discovering or extracting oil or natural gas, whether on land or not;

            (b)         constructing a shaft, pit or quarry, or drilling, for the purposes of discovering or extracting any mineral bearing or other substance;

            (c)         constructing any plant for the purposes of extracting or processing oil, natural gas or any derivative of natural gas, or any mineral bearing or other substance;

            (d)         constructing, installing, altering, repairing, restoring, maintaining, extending, dismantling, demolishing, or removing, wholly artistic works, including sculptures, installations and murals;

            (e)         work prescribed by the regulations not to be construction work for the purposes of this Act.

        (4)         In this Act —

        “construction work” does not include constructing the whole or part of any watercraft.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback